产品名称: 上海紫竹国际大厦

发布日期: 2019-01-23

点击数: 145

询价: 点击产品询价

二维码:

简述: 总建筑面积50218平方米,地下2层,地上22层,建筑总高度99.8米。总包单位:上海森信建设 Construction area is 50,218m2. Two storey basement and 22 storeys overground make the height 99.8m. General contractor: Shanghai Senxin Construction Engineering Co., Ltd.

产品详情

上海紫竹国际大厦(原名浦东世纪花园三期办公楼工程),位于上海市浦东新区芳甸路1108号,是一座高端商务的智能化办公楼。总建筑面积50218平方米,地下2层,地上22层,建筑总高度99.8米。筏板基础,主体为框架剪力墙结构。
Shanghai Park Center International building (formerly named Pudong Century Garden phase Ⅲ Office Building project) is located at NO.1108 Fangdian Road, Pudong new district of Shanghai. It’s an intelligent office building for high-end business, whose covered area is 50,218 m2, with 2 storey basement and 22 storeys overground, and overall height is 99.8m. This building is with raft foundation and frame shear wall structural main body.
总包单位:上海森信建设
General contractor: Shanghai Senxin Construction Engineering Co., Ltd
由我公司承担劳务施工,承包模式;扩大劳务。
Our company did the labor construction package, in which our contract mode was labor supply and expanding services.
本工程先后荣获上海市工程设计优秀奖、优质结构工程奖、安装“申安杯”优质工程、“白玉兰”杯及节约型工地等12种奖励。
This project has won 12 awards including Excellence Award of Shanghai Municipal Engineering Designs, Engineering Award of High Structural Quality, High Installation Quality work of ShenAn Cup, BaiYuLan Cup and title of 'Resource-conserving Site'.

工程施工的重点、难点及技术措施
construction key points, difficulties and technical measures
(1)工程地处上海浦东新区,紧邻上海国际博览中心和世纪公园,施工场地狭窄,环保要求高。
Project site is located in Shanghai Pudong new district, next to Shanghai International Expo Center and Century Park. Space of the construction plant is small, while the environmental requirement is quite high.
(2)基坑开挖深度达9.5米, 局部挖深11.85米,基坑面积大,地下室外墙距磁悬浮电缆约18.8米,并与周边地铁站出入口相通,基坑监护要求高是本工程的一大难点。
Excavation depth of foundation pit is 9.5m; depth of certain part even reaches 11.85m. Area of foundation pit is huge. Basement exterior wall is 18.8m from maglev cable and is interlinked with surrounding metro station entrances. All these elements require a demanding pit guardianship, which is one of the difficulties in this project.
(3)工程基坑面积达1.1万平方米,周长约433米,底板厚1.5米,混凝土浇筑量近1万立方米,防止大体积混凝土底板产生温度裂缝是本工程的又一项难点。
Area of the foundation pit reaches 11,000 m2, perimeter is about 433m, floor thickness is 1.5m and amount of poured concrete is around 10,000 m3. Therefore, to avoid cracking due to change of temperature of mass concrete floor becomes another difficulty in this project.
(4)地下水位高,涉水部位多,防水工程复杂。地下室顶板设置了景观水池和广场集水坑,防渗漏要求高。
High underground water level and many wading places make the waterproof work complex. Drain pit for landscape pool and square is set on basement roof, which asks for a high leakproofness quality.

主体结构工程,严格过程控制,钢筋采用电脑排版,定尺进料,模板、混凝土等分项工程,层层把关,主体框架内实外美,节点方正,垂直度、平整度最大偏差6mm,达到清水混凝土水平。
Major structure work is strictly process controlled. Reinforcement bars are computer typeset. Each sub divisional work such as feeding, formwork, concrete is carefully examined and implemented. These work enable main body frame to be solid and nice-looking. Maximum deviation of the verticality and flatness is 6mm, which reached the level of fair-faced concrete

上一个:上海帝豪大厦

下一个:常州工地

产品详细

18 18 18 18 18

产品名称: 上海紫竹国际大厦

发布日期: 2019-01-23

点击数: 146

询价: 点击产品询价

二维码:

简述: 总建筑面积50218平方米,地下2层,地上22层,建筑总高度99.8米。总包单位:上海森信建设 Construction area is 50,218m2. Two storey basement and 22 storeys overground make the height 99.8m. General contractor: Shanghai Senxin Construction Engineering Co., Ltd.

产品详情

上海紫竹国际大厦(原名浦东世纪花园三期办公楼工程),位于上海市浦东新区芳甸路1108号,是一座高端商务的智能化办公楼。总建筑面积50218平方米,地下2层,地上22层,建筑总高度99.8米。筏板基础,主体为框架剪力墙结构。
Shanghai Park Center International building (formerly named Pudong Century Garden phase Ⅲ Office Building project) is located at NO.1108 Fangdian Road, Pudong new district of Shanghai. It’s an intelligent office building for high-end business, whose covered area is 50,218 m2, with 2 storey basement and 22 storeys overground, and overall height is 99.8m. This building is with raft foundation and frame shear wall structural main body.
总包单位:上海森信建设
General contractor: Shanghai Senxin Construction Engineering Co., Ltd
由我公司承担劳务施工,承包模式;扩大劳务。
Our company did the labor construction package, in which our contract mode was labor supply and expanding services.
本工程先后荣获上海市工程设计优秀奖、优质结构工程奖、安装“申安杯”优质工程、“白玉兰”杯及节约型工地等12种奖励。
This project has won 12 awards including Excellence Award of Shanghai Municipal Engineering Designs, Engineering Award of High Structural Quality, High Installation Quality work of ShenAn Cup, BaiYuLan Cup and title of 'Resource-conserving Site'.

工程施工的重点、难点及技术措施
construction key points, difficulties and technical measures
(1)工程地处上海浦东新区,紧邻上海国际博览中心和世纪公园,施工场地狭窄,环保要求高。
Project site is located in Shanghai Pudong new district, next to Shanghai International Expo Center and Century Park. Space of the construction plant is small, while the environmental requirement is quite high.
(2)基坑开挖深度达9.5米, 局部挖深11.85米,基坑面积大,地下室外墙距磁悬浮电缆约18.8米,并与周边地铁站出入口相通,基坑监护要求高是本工程的一大难点。
Excavation depth of foundation pit is 9.5m; depth of certain part even reaches 11.85m. Area of foundation pit is huge. Basement exterior wall is 18.8m from maglev cable and is interlinked with surrounding metro station entrances. All these elements require a demanding pit guardianship, which is one of the difficulties in this project.
(3)工程基坑面积达1.1万平方米,周长约433米,底板厚1.5米,混凝土浇筑量近1万立方米,防止大体积混凝土底板产生温度裂缝是本工程的又一项难点。
Area of the foundation pit reaches 11,000 m2, perimeter is about 433m, floor thickness is 1.5m and amount of poured concrete is around 10,000 m3. Therefore, to avoid cracking due to change of temperature of mass concrete floor becomes another difficulty in this project.
(4)地下水位高,涉水部位多,防水工程复杂。地下室顶板设置了景观水池和广场集水坑,防渗漏要求高。
High underground water level and many wading places make the waterproof work complex. Drain pit for landscape pool and square is set on basement roof, which asks for a high leakproofness quality.

主体结构工程,严格过程控制,钢筋采用电脑排版,定尺进料,模板、混凝土等分项工程,层层把关,主体框架内实外美,节点方正,垂直度、平整度最大偏差6mm,达到清水混凝土水平。
Major structure work is strictly process controlled. Reinforcement bars are computer typeset. Each sub divisional work such as feeding, formwork, concrete is carefully examined and implemented. These work enable main body frame to be solid and nice-looking. Maximum deviation of the verticality and flatness is 6mm, which reached the level of fair-faced concrete

上一个:上海帝豪大厦

下一个:常州工地

产品详细

18 18 18 18 18

产品名称: 上海紫竹国际大厦

发布日期: 2019-01-23

点击数: 147

询价: 点击产品询价

二维码:

简述: 总建筑面积50218平方米,地下2层,地上22层,建筑总高度99.8米。总包单位:上海森信建设 Construction area is 50,218m2. Two storey basement and 22 storeys overground make the height 99.8m. General contractor: Shanghai Senxin Construction Engineering Co., Ltd.

产品详情

上海紫竹国际大厦(原名浦东世纪花园三期办公楼工程),位于上海市浦东新区芳甸路1108号,是一座高端商务的智能化办公楼。总建筑面积50218平方米,地下2层,地上22层,建筑总高度99.8米。筏板基础,主体为框架剪力墙结构。
Shanghai Park Center International building (formerly named Pudong Century Garden phase Ⅲ Office Building project) is located at NO.1108 Fangdian Road, Pudong new district of Shanghai. It’s an intelligent office building for high-end business, whose covered area is 50,218 m2, with 2 storey basement and 22 storeys overground, and overall height is 99.8m. This building is with raft foundation and frame shear wall structural main body.
总包单位:上海森信建设
General contractor: Shanghai Senxin Construction Engineering Co., Ltd
由我公司承担劳务施工,承包模式;扩大劳务。
Our company did the labor construction package, in which our contract mode was labor supply and expanding services.
本工程先后荣获上海市工程设计优秀奖、优质结构工程奖、安装“申安杯”优质工程、“白玉兰”杯及节约型工地等12种奖励。
This project has won 12 awards including Excellence Award of Shanghai Municipal Engineering Designs, Engineering Award of High Structural Quality, High Installation Quality work of ShenAn Cup, BaiYuLan Cup and title of 'Resource-conserving Site'.

工程施工的重点、难点及技术措施
construction key points, difficulties and technical measures
(1)工程地处上海浦东新区,紧邻上海国际博览中心和世纪公园,施工场地狭窄,环保要求高。
Project site is located in Shanghai Pudong new district, next to Shanghai International Expo Center and Century Park. Space of the construction plant is small, while the environmental requirement is quite high.
(2)基坑开挖深度达9.5米, 局部挖深11.85米,基坑面积大,地下室外墙距磁悬浮电缆约18.8米,并与周边地铁站出入口相通,基坑监护要求高是本工程的一大难点。
Excavation depth of foundation pit is 9.5m; depth of certain part even reaches 11.85m. Area of foundation pit is huge. Basement exterior wall is 18.8m from maglev cable and is interlinked with surrounding metro station entrances. All these elements require a demanding pit guardianship, which is one of the difficulties in this project.
(3)工程基坑面积达1.1万平方米,周长约433米,底板厚1.5米,混凝土浇筑量近1万立方米,防止大体积混凝土底板产生温度裂缝是本工程的又一项难点。
Area of the foundation pit reaches 11,000 m2, perimeter is about 433m, floor thickness is 1.5m and amount of poured concrete is around 10,000 m3. Therefore, to avoid cracking due to change of temperature of mass concrete floor becomes another difficulty in this project.
(4)地下水位高,涉水部位多,防水工程复杂。地下室顶板设置了景观水池和广场集水坑,防渗漏要求高。
High underground water level and many wading places make the waterproof work complex. Drain pit for landscape pool and square is set on basement roof, which asks for a high leakproofness quality.

主体结构工程,严格过程控制,钢筋采用电脑排版,定尺进料,模板、混凝土等分项工程,层层把关,主体框架内实外美,节点方正,垂直度、平整度最大偏差6mm,达到清水混凝土水平。
Major structure work is strictly process controlled. Reinforcement bars are computer typeset. Each sub divisional work such as feeding, formwork, concrete is carefully examined and implemented. These work enable main body frame to be solid and nice-looking. Maximum deviation of the verticality and flatness is 6mm, which reached the level of fair-faced concrete

上一个:上海帝豪大厦

下一个:常州工地

单页简介
江苏宏万里建筑劳务有限公司
总公司办:南京市中山东路288号3006室
苏州昆山办:苏州昆山市衡山路799号19#2303室
总机:0512-36885556
传真:0512-36882869
邮箱:1966@jshwl.com.cn
网址:www.openingtolovenow.com
新闻类别

CopyRight© 2019 江苏宏万里建筑劳务有限公司  苏ICP备14018347号  技术支持:仕德伟科技

这里只有久久一本道精品,最新亚洲一本道久久,久久手机版在线观看,91超频视频免费观看,大香蕉超频视频在线